Braun Intertec has a long history of working with AT&T on a wide range of projects dating back to 1998. Our work with AT&T has included Phase I Environmental Site Assessments (ESAs), Phase II investigations, removal of Petroleum Storage Tanks (PSTs), closure of Leaking Petroleum Storage Tanks (LPSTs) through the Texas Commission on Environmental Quality (TCEQ) PST program (reimbursable and non-reimbursable sites), site remediation and use of soil vapor extraction (SVE) as a treatment method. Braun Intertec has successfully worked with AT&T to become one of their prime contractors in Texas and surrounding states.
Projects
AT&T
Client
美国电话电报公司(原名SBC)